Transportation Division prepared final roadway and drainage plans,
and estimates for this design/build project of over $600 million.
The overall project consists of 15 kilometers (9.5 miles) of
new Toll Road facility with Rick Engineering Company responsible
for 5.6 kilometers (3.5 miles) of the southerly segment of this
project. Included in this segment is a half-diamond interchange
at Otay Mesa Road, an interchange at the Mainline Toll Plaza,
an Operations Center, approximately 800 linear meters (2,600
feet) of Soil Nail Walls, two major extended detention/water
quality basins, and a 1-kilometer (3,300-foot) long bridge spanning
the Otay River. The design and drafting conformed to Caltrans
standards and was performed utilizing MicroStation and InRoads.